Satisfactory Wiki
Advertisement
So you know how your FICSIT Inc. factory can be turned into this incredibly intricate maze of conveyor belts in every direction, merging, splitting, crossing each other above and below? Conveyor belts carry, after all, the life-blood of our company!
~ Caterina Parks's assistant Steve

Conveyor Belt Mk.1
Conveyor Belt Mk.1
Transports up to 60 resources per minute. Used to move resources between buildings.
解鎖於 Tier 0 - HUB Upgrade 4
類別 Logistics
子類別 Conveyor Belts
所需物品
Iron Plate
1

Conveyor Belt Mk.2
Conveyor Belt Mk.2
Transports up to 120 resources per minute. Used to move resources between buildings
解鎖於 Tier 2 - Logistics Mk.2
類別 Logistics
子類別 Conveyor Belts
所需物品
Reinforced Iron Plate
1

Conveyor Belt Mk.3
Conveyor Belt Mk.3
Transports up to 270 resources per minute. Used to move resources between buildings
解鎖於 Tier 4 - Logistics Mk.3
類別 Logistics
子類別 Conveyor Belts
所需物品
Steel Beam
1

Conveyor Belt Mk.4
Conveyor Belt Mk.4
Transports up to 480 resources per minute. Used to move resources between buildings
解鎖於 Tier 6 - Expanded power Infrastructure
類別 Logistics
子類別 Conveyor Belts
所需物品
Encased Industrial Beam
1

Conveyor Belt Mk.5
Conveyor Belt Mk.5
Transports up to 780 resources per minute. Used to move resources between buildings.
解鎖於 Tier 7 - Bauxite Refinement
類別 Logistics
子類別 Conveyor Belts
所需物品
Alclad Aluminum Sheet
1

Conveyor Belts are structures used to transport items between buildings. They come in five marks with different building costs, throughput and appearance. Conveyor Belts can only be built between building connection ports or (Stackable) Conveyor Poles.

Conveyor Belts screenshot

Conveyor Belts in the world

Characteristics[]

Item transportation[]

Once a Conveyor Belt is connected to a building's output (such as a Miner), it will begin to pull items out from the building's output slot. Conversely, belt connected to a building's input port will attempt to push items into its input slot, provided there's sufficient space. Items on the belt can be manually picked up E. Items cannot be manually dispensed onto a belt; it can be done by constructing a temporary Container.

If the belt doesn't lead anywhere, items will not fall off the belt, instead, they will simply stop on the belt. Same occurs if the connected building is either full or cannot accept the item on the belt.

Belts cannot transport item in stacks, each item (visually) on the belt represents one item. Lower mark Belts can also cause bottlenecks especially in the early game, where Miners are capable of producing more items per minute than the belt can transport.

Each mark has higher throughput (measured in items/min) than its predecessor, and also appears more visually advanced.

Mark Items/min Speed difference Mk.1 belt equivalent Visual appearance Unlocked at Ingredients
Mk.1 60 N/A 1 Conveyor Belt Mk.1 Slim and thin. Small LEDs spaced half meters apart. Tier 0 - HUB Upgrade 4 Iron PlateIron Plate
Mk.2 120 2 Conveyor Belt Mk.2 Slightly higher edge. Slightly larger LED spaced further apart. Tier 2 - Logistics Mk.2 Reinforced Iron PlateReinforced Iron Plate
Mk.3 270 2.25× 4.5 Conveyor Belt Mk.3 Added metal guardrail and guard bars on underside. Two bar LEDs. Tier 4 - Logistics Mk.3 Steel BeamSteel Beam
Mk.4 480 1.77778× 8 Conveyor Belt Mk.4 Thicker appearance, higher edge. Guardrail removed. Single large bar LED. Tier 6 - Expanded power Infrastructure Encased Industrial BeamEncased Industrial Beam
Mk.5 780 1.625× 13 Conveyor Belt Mk.5 Added metal guardrail. Reflective bars on the belt. Same LED as mark 4. Tier 7 - Bauxite Refinement Alclad Aluminum SheetAlclad Aluminum Sheet

Engineer transportation[]

Beside serving their primary purpose as transporting items, Conveyor Belts also move engineers. The transportation speed roughly matches how fast items are moving on the belt.

Speed
(Standing)
Speed
(Running with Blade Runners)
Mk.1 1.2 m/s
4.32 km/h
52.92 km/h
Mk.2 2.4 m/s
8.64 km/h
57.24 km/h
Mk.3 5.4 m/s
19.44 km/h
68.04 km/h
Mk.4 9.6 m/s
34.56 km/h
83.16 km/h
Mk.5 15.6 m/s
56.16 km/h
104.76 km/h

Construction[]

A single Conveyor Belt segment can be from ~0.5 up to 56 meters long (exactly 7 Foundations), calculated using the euclidean distance formula . The minimum turn radius is 2 meters. The building cost is roughly 0.5 materials per meter, rounded up to nearest integer.

The maximum slope is 35°, calculated using arctan(Z/sqrt(X^2+Y^2)) (in degrees, where X, Y and Z are the belt's diplacement on the axes). Conveyor Belts cannot incline along the Z axis while turning in the XY plane. They will do one, then the other. The greatest possible rise in the shortest distance is 31 meters vertically and 45 meters horizontally.

When building between poles, the first snapping point will always be the input and the second the output, unless if the first point is connecting to an input of other building or conveyor belt. Once constructed, the belt cannot be reversed, but can be directly up/downgraded into other conveyor marks by aiming at them with the other mark.

Belts can be built on top of some buildings, such as Constructors, provided there is a valid spot for a conveyor pole to be automatically placed on. They can also intersect each other, some non-colliding entities and terrain freely.

Placement errors[]

Encroaching other's clearance[]

This means the belt is being constructed through other buildings. Conveyors have to be always constructed second, after the buildings they are being connected to are already built, with two exceptions:

  • The second Conveyor Pole can be built alongside the belt, once it is snapped to one end
  • Conveyor Splitters and Mergers can be built on existing belts, however, this doesn't respect the foundation grid.
  • It may be due to directional errors, such as connecting a building's output to another building's output.

The floor is too steep[]

This means the floor below where the Conveyor Pole would be built is too uneven. Using a flat surface, such as a Foundation, could help.

The conveyor belt is too short/long/steep[]

Refer to § Construction above.

Tips[]

  • Conveyor ports on buildings display whether they are an output or input. Outputs have green > arrows, inputs orange ≡ symbols.
Conveyor connectors

Examples of conveyor connectors (ports) with direction labelled.

Trivia[]

  • A single item occupies roughly 1.186 meters on a belt.
  • 843 items fit on a belt 1000 meters long.
  • Marks 1-3 show the belt reversed at the underside. Marks 4-5 have metal on the bottom, but still show the reversed belt when clipped through.
  • In the Conveyor Belt Speeds video, Conveyor Belts can be clearly heard from further away (especially higher marks), but they are quite quiet in-game.
  • Higher tiers of belts generally have guards at the edges to protect items (and the Engineer) from slipping off the sides. Take note this does not totally prevent the Engineer though, one can be slingshot out from sharp turns.
  • Conveyor Poles supporting a Conveyor Belt can be deconstructed without affecting the now floating belt.

History[]

See also[]


Advertisement